* Size rounded off to the nearest footBUILDING DIMENSIONSCAUTION: SOME PARTS HAVE SHARP EDGES. CAREMUST BE TAKEN WHEN HANDLING THE VARIOUS PIECESTO AV
It is important that the entire floor frame be anchored after the building is erected.Below are recommended ways of anchoring. Anchoring Down The Buil
1166769Door Slide (2)66382Lower Door Guide (2)7972Door HandleLock Bracket (1)7022Eave Bracket4 (14x21)8 (14x31)66646Washer960 (14x21)1400 (14x31)66444
Parts List12Assembly Part PartKey No. Number Description Carton 1 Carton 2 Carton 3 Carton 4 Carton 5 1 7023 Left Roof Trim 2 2 7024 Right Roof Trim
13Assembly by Key No. for 14x21 BuildingBX13
Additional Parts for & 14' x 31'14Carton 6 & 7Assembly Part Part Wayne DaltonKey No. Number Description Door Carton 8 Carton 965 947
15Assembly by Key No. & 14' x 31' BuildingBX15
1 Assemble 1/2 truss at a time. At-tach column gusset to lower chordsecurely using #1/4-20x1/2" hex headbolts and square nuts. All other con-ne
The gables go on top of the front andrear walls to support the roof beams.The center columns support the trussand the framework.NOTEThe gables are pac
The roof beams join the gables to thetruss and supports the roof panels.1 Align the holes on a left and rightroof beam back-to-back and fastentogether
1 Place the floor frame pieces on thefoundation. Assemble the 4 cornersof the floor frame using 3 bolts fromthe bottom with nuts on top at eachcorner
2Owner's ManualBefore beginning construction, check local building codes regarding footings, locationand other requirements. Study and understand
1 Fasten side floor frames togetherwith a column gusset using 2 boltsfrom the bottom and nuts on top. Atrear of building, repeat procedure.2 Positio
NOTEThe remainder of the buildingassembly requires many hoursand more than one person. Tiedown and support assemblybefore the end of the work day.A p
The mid frame pieces give rigidity tothe sides and rear wall.NOTE Before installing side wallchannels decide at which locationyou want the side entra
1 Position right side eave channelagainst support columns. Fastenchannel to corner panel. Fasten col-umns to side eave channel using 2bolts and nuts
1 Fasten front frames at the top tofront wall panels with 3 screws. Donot fasten hole nearest door openingat this time.2 Fasten front columns to the
1 Position Truss Assembly on build-ing by sliding column gussets overcenter columns and fasten with 8bolts and nuts on each gusset.2 Position right an
Each wall panel has a crimped rib on1 side. The crimped rib should gounder the rib of the panel that followsit.1 Fasten the wall panels at the topand
Step 12BX27● Parts Needed For ●Wall Channel/Door Jamb●●●●● 9477 Door Jamb (2)●●●●● 9466 Wall Channel (2)27Top ViewThe door jambs reinforce the doorope
Step 13BX28● Parts Needed For ●Gable/Roof Beams●●●●● Right Gable Assembly (1)●●●●● Roof Beam Assembly (2)28STEP21Lift and fasten a right gable assem-b
29●●●●● Roof Beam Assembly (8)●●●●● Left Gable Assembly (2)●●●●● Right Gable Assembly (1)●●●●● 9462 Roof Beam Assembly (5 14x31)● Parts Needed For ●Ga
3Selecting and Preparing Your Site: Before assembly, you will want to decide ona location for your building. The best location is a level area with go
30●●●●● 6954 Gable-Truss Strut (4 14x21) (2 14x31)● Parts Needed For ●Gable-Truss StrutStep 15STEP1STEPSTEP23BX301Fasten a gable-truss strut to
31Squaring the BuildingStep 16STEP1STEP23BX31STEP451Square the building on the founda-tion and at the top, by measuringdiagonally from corner to corne
32● Parts Needed For ●Left/Right Roof PanelsStep 17STEP2BX32●●●●● 9492 Right Roof Panel (2)●●●●● 9493 Left Roof Panel (2)Installing the roof panels is
33● Parts Needed For ●Roof PanelsStep 18STEPSTEP3BX33●●●●● 9491 Roof Panel (4)1Position a roof panel overlappingrib of left corner roof panel. Fasteno
34● Parts Needed For ●Ridge CapStep 19BX34●●●●● 9509 Ridge Cap (1)1STEP1Install a ridge cap on the com-pleted roof section using bolts andnuts. Do no
35● Parts Needed For ●Roof Panels & Ridge CapStep 20BX35●●●●● 9509 Ridge Cap (1)●●●●● 9491 Roof Panel (6)2STEP1Install 4 roof panels working sidet
36● Parts Needed For ●Roof Panels/Ridge CapsStep 21BX36●●●●● 9509 Ridge Cap (1)●●●●● 9512 Ridge Cap (1 1431)●●●●● 9491 Roof Panel (4 14x21) (12 14x31)
37● Parts Needed For ●Roof TrimStep 22BX37●●●●● 7023 Left Roof trim (2)●●●●● 7024 Right Roof Trim (2)●●●●● 9510 Side Roof Trim (6)●●●●● 9513 Side Roof
38● Parts Needed For ●Side Door AssemblyStep 23BX38●●●●● 10490 Door (1)●●●●● 10505 Horizontal Door Brace (2)●●●●● 9500 Vertical Door Brace (2)NOTETo
39● Parts Needed For ●Door InstallationStep 24BX39Door Assembly (1)●●●●● 7972 Door Handle Lock Bracket (1)1Position door slides onto the legs,from the
4Safety precautions are important to follow throughout the construction of your building.•Care must be taken when handling variouspieces of your build
40● Parts Needed For ●Vertical Tracks Roll-Up-DoorStep 25BX401 Attach right and left vertical tracksloosely to right and left track supportsusing 1/4-
41● Parts Needed For ●Roll-Up-DoorStep 26BX41●●●●● 7817 Spring Support Bracket (2)●●●●● 10455 Track Strut (2)STEP1STEP31Install spring support bracket
42● Parts Needed For ●Roll-Up-DoorStep 27BX42CAUTION:FROM THIS POINT ON, BE SURETO USE EXTREME CAUTIONUNTIL THE DOOR IS PROPERLYSPRUNG AND OPERATING1A
43Step 28BX43STEP2STEP11Position right and left door jambsto right and left track supports withnotched end on top, facing insidebuilding.2Fasten long
SOME FACTS ABOUT RUSTRusting is a natural oxidizing process that occurswhen bare metal is exposed to moisture. Problemareas include screw holes, unfin
Finish: For long lasting finish, periodically clean and wax the exterior surface. Touch-up scratches as soon as you notice them on your unit. Immedia
6ACCESSORIES... BW06 Web* Some drilling required to fit buildings without mid-wall bracing.Model No. SS404• Makes 8" to 12" (20-30cm)
THIS PAGEWA SLEFTBLANKINTENTIONALLY7
THIS PAGEWA SLEFTBLANKINTENTIONALLY8
The Foundation For Your Building9Foundation BX9Concrete SlabThe slab should be at least 4" (10cm) thick. It must be level and flat to provide