Arrow CHD1010 Manual de instrucciones Pagina 25

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 48
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 24
25
You will need for this page:
Step 8: Continued
25H
(QTY: 150+)
Wall Panel
10+
7822
(QTY: 9+)
Place small bolt thru center hole where Panels overlap.
Working one side at a time, lift the Panels into
place and secure top and bottom of Panels
with Small Screws. Be sure to overlap ribs as
shown on the previous page.
1
2
Place a Small Bolt and Nut through the center
hole of the Panel everywhere Panels overlap,
as shown below. Note: When attaching to
corner panels, use screws.
10’x10’ (3,0 m x 3,1 m)
building shown.
SBSS
Continue until ALL Wall
Panels have been installed.
R
Vista de pagina 24
1 2 ... 20 21 22 23 24 25 26 27 28 29 30 ... 47 48

Comentarios a estos manuales

Sin comentarios